WINDWAVES

Kincardine OWF

Offshore

Client

BUSINESS UNIT

ENERGY AND SUSTAINABILITY

DIVISION
NAVAL-OFFSHORE

BUSINESS AREA
OFFSHORE WIND STRUCTURES

LINE OF BUSINESS
FLOATING OFFSHORE SOLUTIONS - SEMI-SUBMERSIBLE

5 units of semi-submersible platform for 9.5 MW turbines
WindWaves worked as the main subcontractor of Navantia for the assembly of 5 floating units that Navantia manufactured for the Kincardine project belonging to the Cobra group.
The work was carried out between the shipyards of Navantia Fene (4 units) and Navantia Puerto Real (1 unit).

The works carried out by WindWaves consisted of:

- Process Engineering
- Logistic control and material reception
- Quality control of the entire assembly process
- Joining works of semi-columns and bracings
- Prefabrication and assembly of WEPs, Boatlanding, and assembly of the rest of secondary equipment
- Platform painting
- Electrical and piping assembly works
- Dimensional control and NDT works
- Scaffolding of the structure

COUNTRY
BUDGET
YEAR